Welcome

We're loading the content, give us a second. This won't take long!


Blowerproof Logo

Blowerproof Airtightness System

Application Areas

  1. Junction lower floor / vertical wall
  2. Junction window sill / vertical wall
  3. Junction window lintel / vertical wall
  4. Junction window reveal / vertical wall (horizontal view)
  5. Vertical wall (Cross section)
  6. Perforation vertical wall
  7. Junction top floor / vertical wall
  8. Penetration of top floor
  9. Junction French window / vertical wall
  10. Junction inclined roof / vertical wall
  11. Penetration inclined roof
  12. Junction inclined roof / roof ridge
  13. Junction inclined roof / window
  14. Junction rolling blind / vertical wall
  15. Junction intermediate floor / vertical wall
  16. Junction exterior door lintel / vertical wall
  17. Junction exterior door sill / sill
  18. Penetration lower floor / crawlspace or basement
  19. Junction service shaft / access door
  20. Junction internal wall / intermediate floor

Floor Wall Blowerproof Spray


Floor to wall junction

+ - Paint-on or spray apply BBA approved BLOWERPROOF coating for the permanent airtightness of the floor to wall junctions.!

Paint-on or spray apply BBA approved BLOWERPROOF coating for the permanent airtightness of the floor to wall junctions.

For private houses and small scale projects; The floor to wall junctions on all floorlevels need to be made airtight. Apply Blowerproof coating before the floor insulation and screed is done, and before the inside wall finish is applied.

For larger scale projects:
The floor to wall junctions on all floorlevels need to be made airtight. Apply Blowerproof coating before the floor insulation and screed is done, and before the inside wall finish is applied.

Wall to ceiling junction

+ - Paint-on or spray apply BBA approved BLOWERPROOF coating for the permanent airtightness of the wall to ceiling junctions.

For private houses and small scale projects.
The wall to ceiling junctions on all floorlevels along the outer skin of a house or building need to be made airtight. Apply on the inside, before the wall finish is applied.

For larger scale projects
The wall to ceiling junctions on all floorlevels along the outer skin of a house or building need to be made airtight. Apply on the inside, before the wall finish is applied.

Window Jambs

+ - Paint-on or spray apply BBA approved BLOWERPROOF coating for the permanent airtightness of the floor to wall junctions.

Application

  1. Fill gaps between the window frame and the wall with PU foam and cut off excess
  2. Apply protection tape on the profiles at about 5mm from the side
  3. Brush on Blowerproof Liquid Brush
  4. Remove tape immediately after application

Pipe penetrations gaps

+ - Penetration gaps must be made airtight in order to obtain an airtight house or building. Sealing is simple with BBA approved Blowerproof coating

Application

  1. Ensure dustfree surface
  2. Fill gaps greater than 5mm with polyurethane foam (trim after drying) or use a cement based fast setting mortar
  3. Apply Blowerproof Liquid Brush in two coats
  4. Check for full coverage

Walls

+ -

Application method Paint:

  1. Ensure dustfree surface and remove loose parts.
  2. Close gaps > 5mm with a cementbased gap filling mortar.
  3. Brush apply Blowerproof Liquid Brush


Application method Spray:
  1. Ensure dustfree surface and remove loose parts.
  2. Close gaps > 2mm with a cementbased gap filling mortar.
  3. Spray apply Blowerproof Liquid

Change View

img
img
img
img
img
img
img
img
img
Back to top